Bridge Precast Overhang System

Vendor
Surebuilt
Regular price
Call for Pricing
Sale price
Call for Pricing
Regular price
$0
Sold out
Unit price
Quantity must be 1 or more

Precast Overhang System / Stay-In-Place Fascia Form (SIPFF)

Reduce skilled labor needed to set bridge overhang and reduce risk associated with setting and removing bridge overhang brackets. Beam flange is loaded evenly, reducing damage to fascia beam during concrete placement. Accelerate bridge construction, one 5′ SIPFF can be set in 5 minutes.

This SIPFF is designed to prevent any issues with web buckling and any damages that can occur to flange from conventional exterior overhang systems. Hardware from upper connection is removed for rail and overpour. Shop control concrete is less permeable than CIP concrete resulting in longer service life and better aesthetics.

Bridge Precast Overhang System Data Sheet

Go to full site