Don't Miss This Months Sale! Save Now

We're Here to Help! Don't Hesitate to Call Us.

Rock Tred

Chem-Rock Primer

$17913
Shipping calculated at checkout.


Size

Safe & Secure Payments.

  • Amazon
  • American Express
  • Apple Pay
  • Diners Club
  • Discover
  • Meta Pay
  • Google Pay
  • Mastercard
  • PayPal
  • Shop Pay
  • Visa

Chem-Rock Primer

Available Sizes
  • 1.5 Gallon BAG-PAKTM Unit in a single pail
  • 3 Gallon BAG-PAKTM Unit in a single pail
  • 15 Gallon Unit in three 5-gallon pails
Advantages
  • 100% solids
  • Excellent adhesion
  • Rapid cure or low temperature cure
  • Can be field pigmented in any ROCK-TRED Standard Color
  • Odorless / solvent-free
  • Easy mix ratio
  • Moisture tolerant
  • Excellent abrasion resistance

Description

CHEM-ROCK PRIMER is 100% solids, 2-component polyamide epoxy primer formulated to provide superior adhesion to prepared substrates. CHEM-ROCK PRIMER can be applied to "slightly damp" substrates and will cure at temperatures down to 400 F and can also be used as a rapid curing primer in warmer applications. CHEM-ROCK PRIMER contains zero VOC's and meets all USDA/FDA guidelines for use in federally inspected facilities.

Uses

CHEM-ROCK PRIMER can be used as a primer, as a self leveling body coat over uneven substrates, or as a mortar or slurry patching material when combined with ROCK-TRED Aggregates. Its zero VOCs, low-temperature cure and damp substrate tolerance make it perfect for repairs and coatings work inside operating coolers and food processing facilities.

Typical Coverage

CHEM-ROCK PRIMER is typically applied between 60-160 square feet per gallon per coat depending upon substrate and project requirements.

Physical Properties

Volume mix ratio 2 to 1 (Resin to Hardener)
Viscosity (mixed) 1000-1200 CPS Typical
Solids Content (%) 100 % (ASTM D-2697)
VOC Compliant with all US Regulations
Hardness (ASTM D-2240) 70-75 (Shore D)
Application Temps. 40° – 80° F
Gel Time 30 - 40 minutes @ 75° F
Dry to Touch (recoat with similar product) 2 - 5 hours @ 75° F
Through Cure 4 – 6.5 hours @ 75° F
Open for Light Traffic 24 hours @ 75° F
Shelf Life 1 Year in unopened units
 

Limitations & For Best Results

  • Do not thin this product.
  • Do not apply when Humidity exceeds 70% indoors.
  • Allow each coat to dry to 'tack-free' or clear prior to re-coat.
  • When re-coating, always apply the next coat within 24 hours of completing the previous coat.
  • When applying at temperatures below 60° F it is best to "condition" the unopened buckets of material for several hours at the installation temperature prior to applying.

Product Application

Apply by brush, roller or squeegee. ROCK-TRED product test data is based on environmental temperatures of 75° F. Viscosity and working time are always affected by temperatures above or below that mark. When applying product always consider the ambient, surface, and product temperature at the time and place of installation.

Color and Textures

CHEM-ROCK PRIMER is available in Clear (slightly amber) and can be pigmented using ROCK-TRED Colorants. Most ROCK-TRED products are available in a wide range of textures using an appropriate aggregate.

Chemical Resistance

Always refer to ROCK-TRED's chemical resistance chart for specific information on each product / system or contact ROCK-TRED directly.

Product Storage

DO NOT allow ROCK-TRED products to freeze. All ROCK-TRED products should be properly stored above the floor on pallets or shelves, and in an area that has a constant minimum temperature of 50°F.

Surface Preparation

Always apply ROCKTRED products to a clean / sound substrate that is free of laitance, grease, oils, debris, and curing compounds. Concrete substrates should be cured for a minimum of 28 days prior to application of product [except as otherwise noted on the individual Product Data Sheet]. Whenever possible, remove existing coatings and/or flooring systems completely; if complete removal is not possible always perform tests to determine adhesion and compatibility to the existing flooring. Mechanical preparation by means of a shotblasting or diamond grinding machine to a minimum CSP-2 profile is the best and recommended preparation method for CHEM-ROCK PRIMER applications. If the substrate is not properly prepared and the appropriate profile is not achieved, failure of the product to adhere to the substrate may occur.

Clean Up

Application tools and equipment can be cleaned with soap and water immediately after use, or with solvent once the product has begun to cure.

Disposal

Product containers will contain product residue and must be disposed of properly. Label warnings must be observed at all times. All containers must be disposed in accordance with federal, state, and local regulations.

Important Notice

Always read and acquaint yourself with ROCK-TRED's Product Data Sheet, SDS [safety data sheet], and product labels for each individual product prior to mixing and prior to use. For further assistance, product questions, additional information and/or unexpected or unusual installation conditions – contact your Area Sales Representative or ROCK-TRED directly for recommendations. Kit components are pre-measured for optimal performance. Catalyzation errors due to incorrect mixing in the field voids product warranty.