Don't Miss This Months Sale! Save Now

We're Here to Help! Don't Hesitate to Call Us.

Rock Tred  |  SKU: RTSLV-3-CO2

Chem-Rock SL Epoxy (3 Gallons)

$42763
Shipping calculated at checkout.


Safe & Secure Payments.

  • Amazon
  • American Express
  • Apple Pay
  • Diners Club
  • Discover
  • Meta Pay
  • Google Pay
  • Mastercard
  • PayPal
  • Shop Pay
  • Visa

Chem-Rock SL Epoxy

Advantages
  • Low viscosity, easy flowing formulation
  • Good chemical resistance
  • Excellent adhesion
  • 100% solids
  • VOC compliant
  • Good working time, but fast rate of cure
  • Easy mix ratio
  • Good UV and abrasion resistance

Description

CHEM-ROCK SL EPOXY is a low viscosity 2-component, 100% solids water clear cyclo-aliphatic epoxy binder resin. This product provides excellent flow and workability when used as the carrier for ROCK-TRED self-leveling and slurry systems. CHEM-ROCK SL EPOXY provides excellent abrasion resistance and long-lasting durability, has good resistance to most common chemicals and meets all USDA/FDA guidelines for use in federally inspected facilities. It also provides very good UV, gloss and color stability.

Uses

CHEM-ROCK SL EPOXY is typically applied in combination with the appropriate amount of ROCK-TRED SL Aggregate Flour to create the ROCK-TRED SL (self-leveling) System. ROCK-TRED SL EPOXY can also be used as the binder in decorative or solid color slurry broadcast systems when combined with other ROCK-TRED aggregates.

Typical Coverage

CHEM-ROCK SL EPOXY can be applied “neat” at 10 -12 mils depending on surface conditions and porosity of the substrate and can be combined with aggregates and applied in self-leveling or slurry applications up to 3/16”.

Physical Properties

Volume mix ratio 2 to 1 (Resin to Hardener)
Viscosity (mixed) 600-700 CPS Typical
Solids Content (%) 100% (ASTM D-2697)
Hardness (ASTM D-2240) 75-85 (Shore D)
VOC Compliant with all US Regulations
Application Temps. 60° – 80°F
Gel Time 30-40 minutes @ 75°F
Dry to Touch (recoat with compatible products) 2-3 hours @ 75°F
Through Cure 7-9 hours @ 75°F
Open for Light Traffic 24 hours @ 75°F
Shelf Life 1 Year in unopened units

Limitations & For Best Results

  • Do not thin this product.
  • Do not apply when Humidity exceeds 70% indoors.
  • Do not allow to puddle during application.
  • Allow each coat to dry to ‘tack-free’ or clear prior to re-coat.
  • When re-coating, always apply the next coat within 24 hours of completing the previous coat.
  • Do not apply neat at less than 10 mils per coat as separation may result. When applying as part of the ROCK-TRED SL or as a slurry system do not apply thicker than 3/16” per lift.
  • Add approximately 18 lbs. of PCA329 or other approved aggregate per mixed gallon of CHEM-ROCK SL EPOXY to create a slurry mix.
  • When pigmenting this product using lighter colors two 10-12 mil coats may be required for full hide.

Product Application

Apply neat by brush, roller or squeegee. Refer to CHEM-ROCK SL EPOXY System Data sheet for detailed instructions on how to apply ROCK-TRED Self-Leveling System. Product test data is based on environmental temperatures of 75° F. Viscosity and working time are always affected by temperatures above or below that mark. When applying product always consider the ambient, surface, and product temperature at the time and place of installation.

Color and Textures

CHEM-ROCK SL EPOXY is manufactured in WATER CLEAR and can be field pigmented using ROCK-TRED colorants. Most ROCK-TRED products are available in a wide range of textures using an appropriate aggregate.

Chemical Resistance

Always refer to ROCK-TRED’s chemical resistance chart for specific information on each product / system or contact ROCK-TRED directly.

Product Storage

DO NOT allow ROCK-TRED products to freeze. All ROCK-TRED products should be properly stored above the floor on pallets or shelves, and in an area that has a constant minimum temperature of 50°F.

Surface Preparation

Always apply ROCK-TRED products to a clean / sound substrate that is free of laitance, grease, oils, debris, and curing compounds. Concrete substrates should be cured for a minimum of 28 days prior to application of product [except as otherwise noted on the individual Product Data Sheet]. Whenever possible, remove existing coatings and/or flooring systems completely; if complete removal is not possible always perform tests to determine adhesion and compatibility to the existing flooring. Mechanical preparation by means of a shotblasting or diamond grinding machine to a minimum CSP-2 profile followed by application of an appropriate ROCK-TRED primer or base system is the best and recommended installation method for ROCK-TRED SL applications. If the substrate is not properly prepared and the appropriate profile is not achieved, failure of the product to adhere to the substrate may occur

Clean Up

Application tools and equipment can be cleaned with soap and water immediately after use, or with solvent once the product has begun to cure.

Disposal

Product containers will contain product residue and must be disposed of properly. Label warnings must be observed at all times. All containers must be disposed in accordance with federal, state, and local regulations.

Important Notice

Always read and acquaint yourself with ROCK-TRED’s Product Data Sheet, SDS [safety data sheet], and product labels for each individual product prior to mixing and prior to use. For further assistance, product questions, additional information and/or unexpected or unusual installation conditions – contact your Area Sales Representative or ROCK-TRED directly for recommendations. Kit components are pre-measured for optimal performance. Catalyzation errors due to incorrect mixing in the field